Generate professional risk assessments, method statements and site diaries in seconds. Get plain English answers on UK building regulations and CDM 2015 duties. Built for site managers and foremen who do not have a spare evening for paperwork.
From GBP 9.99 a month. Cancel anytime. Lifetime access also available.
| Hazard | Risk | Control |
|---|---|---|
| Fall from height | High | Harness, edge protection, scaff tag |
| Falling materials | Med | Toe boards, exclusion zone below |
| Manual handling | Low | Team lift, mechanical aid for transoms |
Site Manager AI turns a few simple inputs about the task into the documents a principal contractor or HSE inspector expects to see, written in proper construction language.
Describe the task, get a structured risk assessment and method statement with hazards, controls and sequence of work. Review, adjust and share.
Ask about CDM duties, building regulations or safe systems of work and get a clear answer you can act on, without digging through PDFs.
Capture today's progress, labour, weather and deliveries into a tidy site diary entry in seconds, ready for the file and the next audit.
Real examples of the documents and answers you get in minutes. Every output is ready to review, edit and use on site.
Sequence of work
Key hazards and controls
Silica dust, noise, hand-arm vibration and hidden services. Controlled with on-tool extraction plus an FFP3 mask, ear defenders, cut-and-pause working to limit vibration, and cable detection before cutting.
"Do I need a principal designer on a project with two contractors?"
Yes. Under CDM 2015, where more than one contractor is involved, the client must appoint a principal designer and a principal contractor in writing. On domestic projects those client duties usually pass to the principal contractor.
You also need the pre-construction information, a construction phase plan, and an F10 notification to the HSE if the work runs over 30 working days with more than 20 workers on site at any one time, or exceeds 500 person-days.
Everything is included from day one. Pay monthly or take lifetime access and never think about it again.
GBP 9.99 a month, or a one-off GBP 150 for lifetime access, with no per-user fees. You can cancel the monthly plan anytime.
Full RAMS packs, standalone method statements, risk assessments and site documents, generated from a short description of the task and scoped to current UK guidance including CDM 2015.
Documents are generated to current UK health and safety guidance including CDM 2015 duties. You review and edit every document before you issue it, so a person always signs off the final wording.
Yes. Every document is fully editable before you export it, so you can adjust the wording to match how you actually work on site.
Yes. As well as the web app there is an iOS app for iPhone and iPad, so you can produce or check paperwork from the site rather than back at a desk.
Create your account and have your first RAMS document drafted before the kettle boils. Built for UK site managers and foremen.
Get StartedSecure payment powered by Stripe · From GBP 9.99 a month