RAMS and method statement for roofing

UK construction guidance. Support, not legal advice.

Roofing is working at height, and falls from height remain the single biggest cause of death in UK construction. A risk assessment and method statement for roofing is read carefully because two things go wrong again and again: people fall from the edge, and people fall through a fragile surface that looked solid. A roofing RAMS is built around the work at height hierarchy, avoid the work at height where you can, prevent falls with collective protection, and only then minimise the distance and consequences. This guide sets out what a roofing RAMS should cover on a UK site, whether it is a pitched re-roof, a flat roof, or work on an industrial sheeted roof.

What a RAMS for roofing needs to cover

Be specific about the roof and the task. State the roof type, pitched or flat, its construction and whether any part is fragile, the access to be used, the edge protection, and the task itself, from a full strip and re-cover to a repair or a torch on felt job. An industrial roof with fibre cement sheets and rooflights is a very different risk from a domestic pitched re-roof with a full scaffold, and the document should read like the actual roof in front of you.

The main hazards of roofing

The control measures a reviewer expects

A roofing reviewer looks first for collective protection at the edge and for how fragile surfaces are controlled.

The method statement sequence for roofing

  1. Survey the roof for type, pitch, fragile areas and the condition of the deck and timbers.
  2. Erect the access and the collective edge protection, and install safety nets under the work where needed, before anyone accesses the roof.
  3. Set up the exclusion zone below and brief the team with a toolbox talk.
  4. Work without ever stepping on a fragile surface, using staging and crawl boards and keeping clear of unprotected edges.
  5. Raise and lower materials in a controlled way and keep the roof tidy to avoid trips and dropped objects.
  6. Manage the weather, stopping in high wind, ice or heavy rain.
  7. For torch on or other hot works, operate a hot works permit with a fire watch during and after.
  8. Clear the roof, inspect the finished work, then dismantle the access and edge protection last.

Key point: the two roofing killers are falls from the edge and falls through fragile surfaces. Never rely on a rooflight or an old roof sheet to take a person's weight. Treat every rooflight and every industrial or ageing roof as fragile until there is clear evidence otherwise.

Where roofing RAMS usually get rejected

Frequently asked questions

What is a fragile roof?

A fragile surface is one that will not reliably bear the weight of a person and any load they carry. Rooflights, fibre cement and older asbestos cement sheets, liner panels and corroded or rotten roofs are all fragile. Treat any roof or rooflight as fragile unless there is clear evidence it is not.

Can I use a harness for roof work?

A harness is a last resort, used only where collective protection such as edge protection or safety nets is not reasonably practicable. It needs a suitable anchor point, the right lanyard and a rescue plan, because hanging in a harness is itself dangerous if no one can recover the person.

Do I need edge protection on a flat roof?

Yes, in most cases. Provide guardrails or a barrier to the perimeter, or for short duration work a clearly demarcated safe zone set well back from the edge, so no one can reach the edge unprotected.

Is this legal advice?

No. This is a plain-English working summary to support site teams. For the detail see the Work at Height Regulations 2005 and HSE guidance HSG33, health and safety in roof work.

New site-safety guides by email

Get our latest toolbox talks, RAMS guides and site-safety updates in your inbox as they land. No noise, just the new guides.

We use your email only to send site-safety guides. Unsubscribe any time.

Do the roofing RAMS in minutes

Site Manager AI produces a task-specific risk assessment and method statement for roofing, sequenced and scoped to UK regulations, ready to export as a PDF. You describe the roof and the task and it drafts the hazards, the edge and fragile surface controls and the steps for you to check and adjust. GBP 9.99 a month.

Get started with Site Manager AI Prefer your phone on site? Download Site Manager AI on the App Store.

Related guides: RAMS for working at height, RAMS for scaffolding, RAMS for hot works, and the how to write a risk assessment guide.